{"id":183,"date":"2026-11-11T21:50:42","date_gmt":"2026-11-11T21:50:42","guid":{"rendered":"https:\/\/planspage.com\/wordpresstheme\/building-approval-the-drawings-you-need-and-how-long-it-takes\/"},"modified":"2026-11-11T21:50:42","modified_gmt":"2026-11-11T21:50:42","slug":"building-approval-the-drawings-you-need-and-how-long-it-takes","status":"publish","type":"post","link":"https:\/\/planspage.com\/wordpresstheme\/building-approval-the-drawings-you-need-and-how-long-it-takes\/","title":{"rendered":"Building approval: the drawings you need and how long it takes"},"content":{"rendered":"<h2>Which drawings the authority asks for<\/h2>\n<p>Most authorities ask for architectural drawings (plans, sections, elevations), a site plan, and structural drawings for anything above a simple single storey. Some also ask for drainage and electrical layouts.<\/p>\n<h2>Who submits<\/h2>\n<p>Drawings are usually submitted and stamped by a registered architect and engineer. Your architect can tell you the local process and fees.<\/p>\n<h2>How long it takes<\/h2>\n<p>Approval times vary by county and city. Ask your architect for the current timeline before you plan your start date.<\/p>\n<h2>Avoid delays<\/h2>\n<p>Check your land title, zoning and setbacks before you buy a plan. Plans on this site show the plots they fit, which saves a redesign later.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Which drawings the authority asks for Most authorities ask for architectural drawings (plans, sections, elevations), a site plan, and structural drawings for anything above a simple single storey. Some also ask for drainage and electrical layouts. Who submits Drawings are usually submitted and stamped by a registered architect and engineer. Your architect can tell you [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":83,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-183","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-approvals"],"_links":{"self":[{"href":"https:\/\/planspage.com\/wordpresstheme\/wp-json\/wp\/v2\/posts\/183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/planspage.com\/wordpresstheme\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/planspage.com\/wordpresstheme\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/planspage.com\/wordpresstheme\/wp-json\/wp\/v2\/comments?post=183"}],"version-history":[{"count":0,"href":"https:\/\/planspage.com\/wordpresstheme\/wp-json\/wp\/v2\/posts\/183\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/planspage.com\/wordpresstheme\/wp-json\/wp\/v2\/media\/83"}],"wp:attachment":[{"href":"https:\/\/planspage.com\/wordpresstheme\/wp-json\/wp\/v2\/media?parent=183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/planspage.com\/wordpresstheme\/wp-json\/wp\/v2\/categories?post=183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/planspage.com\/wordpresstheme\/wp-json\/wp\/v2\/tags?post=183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}